0:00 to 0:12 / Existing practices
The pump and its records need to be ready.
This pump moves liquid through the plant. Its drawings, material records and test results can arrive separately, leaving the buyer to chase a missing report.
- Pump P-101
- Supplier records
- Buyer review
Illustrative fragmented workflow, not a claim about every supplier.
0:12 to 0:26 / IOGP today
IOGP gives the order a shared starting point.
For pumps within its scope, IOGP S-615 adds common purchasing requirements to API 610. The buyer and supplier can start from the same agreed basis.
- API 610
- IOGP S-615
- Project requirements
This is an in-scope centrifugal pump example, not a specification for every pump type or service.
0:26 to 0:38 / IOGP today
Define what this pump must deliver.
The project confirms the required flow and pressure, checks and records. The order also sets who reviews the evidence and when it is needed.
- Pump duty
- Required checks
- Records and deadlines
Use the applicable specification documents and order editions. Project choices still apply.
0:38 to 0:52 / Intended Helios workflow
Put the agreed requirements into the workflow.
Helios would connect each agreed requirement to a task, its owner and the evidence for this pump. The project team would check the mapping before use.
- Requirement source
- Supplier task
- Evidence for P-101
Intended workflow until verified. This does not demonstrate automatic interpretation of the standard.
0:52 to 1:04 / Intended Helios workflow
The performance test report has not arrived.
This example order requires the report before handover. Demo requirement P-08 would stay open, with the pump supplier responsible for providing the missing record.
- Demo P-08
- Owner: pump supplier
- Status: missing
P-08 and its timing are invented order detail. Testing and acceptance follow the applicable requirements.
1:04 to 1:18 / Intended Helios workflow
Check the report against the order.
An authorised reviewer checks the submitted results and records the decision. Any open issue remains visible. Uploading the report does not establish that the pump is accepted.
- Received
- Awaiting review
- Decision and open issues
Record review is separate from equipment acceptance.
Keep document receipt, review and equipment acceptance separate.
1:18 to 1:30 / Intended Helios workflow
Hand over a record the next team can follow.
The requirement, report and review history would stay linked to P-101. This could reduce late document work and make evidence easier to find.
- P-101
- Requirement and report
- Review history
Benefit is a pilot hypothesis, not a savings or safety guarantee.